Construction of International Cooperation and Convention Centre "Rudraksh" in Varanasi. - Technology
Project Name : Construction of International Cooperation "Rudraksh" in Varanasi.
The project was envisaged during the visit of the Hon’ble Prime Minister of India and Hon’ble Prime Minister of Japan in the month of December 2015. The Govt. Japan was pleased to help India in establishing the project and fund the same as Grant-Aid project. It is as a symbol of friendship between Japan and India. The foundation has been laid by the Hon’ble Prime Minister of India on 14.07.2018. The project has been awarded to M/s Fujita Corporation, Tokyo, Japan.
18600 Lakh
Project Budget
07 Jan 2018
Start Date
29 Feb 2020
Completion Date
Varanasi
Location
Project Team / Contact Us
| S.No. | Name(Mr/Mrs) | Designation | Office Address | Office Number | Mobile Number | Email ID |
|---|---|---|---|---|---|---|
| 1 | Mr. Ashok Kumar Gupta | Chief Project Manager | Behind Central Office, BHU Project Zone, CPWD, BHU, Varanasi | vnscpm-bhu@cpwd.gov.in | ||
| 1 | Mr. Vinay Kumar Tiwari | Project Director | Behind Central Office, BHU Project Zone, CPWD, BHU, Varanasi | eevpd3@gmail.com | ||
| 1 | Mr. Abhishek Verma | Assistant Executive Engineer | Behind Central Office, BHU Project Zone, CPWD, BHU, Varanasi | eevpd3@gmail.com |
Highlights
Implementation Strategy
| S.No. | Description | Images | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 |
|
|
||||||
| 2 |
HVAC -Air cooled chiller + Variable Water Volume system (Heat source) -Heat exchange fresh air handling + Valuable Air Volume system (Hall) -Valuable Refrigerant Volume + Heat recovery ventilator (Meeting room, office, ) -HVAC energy meter with BMS Plumbing -Water saved plumbing fixture -Water meter with BMS Fire fighting -Yard hydrant system -Automatic sprinkler system -Wet riser system -Fire extinguisher -Water curtain system -Clean agent fir suppression system
POWER -Power incoming/distribution system (33kv power, CSS) -Standby generator (full backup) -Central Battery system for Emergency lighting -Lighting, Socket outlet and Motor control center -Grounding and Lightning -Photovoltaic system (NBC and GRIHA complied)
COMMUNICATIONS
-Public address -Security system -IT and telecommunication system -Fire detection and alarm system
HALL EQUIPMENT -Stage Lighting -Hall PA system -Hall Audio system
|
|

