Setting up of WHO Global Centre for Traditional Medicines Interim Office i/c/ IEI, DG Set, Lift, CCTV etc. and development works at ITRA Campus, Jamnagar (Gujarat)

Institute of Teaching and Research in Ayurveda Campus, Jamnagar

Project Name : Setting up of WHO Global Centre for Traditional Medicines

• Initially the building was G+2 having hall type construction which was proposed to change into state of art building. • Hall type construction is changed into Cubicles, compartments and units. • The Kota Stone flooring has been replaced by Italian marble flooring, Granite flooring and bamboo wood flooring. • Aluminum windows are changed with double glazed unit of UPVC windows. • Single glazing of windows is changed into higher insulation double glazed window units. • New porch & fountain has been added. • A six passenger and thirteen passenger lifts have been installed. • Washroom area has been changed into prefabricated cubicles. • Exterior paint of building was nonoptimal which is replaced by whether proof long lasting ultra tech texture paint.

img

1349.46 Lakh

Project Budget

img

04 Jan 2022

Start Date

img

31 Jul 2022

Completion Date

img

Jamnagar

Location

Project Team / Contact Us

S.No. Name(Mr/Mrs) Designation Office Address Office Number Mobile Number Email ID
1 Sh. Rajeev Sharma Chief Engineer 4th Floor, Kendriya Nirman Sadan, Sector - 10 A, Near CH - 3 Circle, Gandhinagar - 382010 gncewz4.cpwd@nic.in
2 Sh. Vijay Prakash Rao Senior Architect Office of the Special DG, Project Region New Delhi, Central Vista Project, 4th Floor, Nirman Bhawan, New Delhi - 110011 vijayprakash_rao@yahoo.com
3 Sh. Baboolal Suthar EE Civil Office of the EE, Jamnagar Division, Gujarat Ayurved University, Jamnagar - 361008 baboolal.suthar@gov.in

Highlights

S.No. Description Images
1
2
3

Implementation Strategy

S.No. Description Images
1
  • Initially the building was G+2 having hall type construction with Kota stone flooring, sanitary units in one corner with old WC & fittings which was proposed to change in state of art building having Italian marble flooring, bamboo wood flooring, granite flooring.


  • Hall type construction is changed into Cubicles, compartments and units.


  • Aluminum windows are changed with UPVC windows.


  • Single glazing is changed into higher insulation double glazed units.


  • In old building no lift exists , however one lift well was available for 6 passenger lift.


  • 1 new universal accessibility lift with 13 passenger capacity is created and installed.


  • Exterior paint of building was nonoptimal which is replaced by wheather proof, long lasting ultra tech texture paint.

Lessons Learnt / Take Aways

S.No. Description Images