Precast Construction Technology - Technology
Project Name : DESIGN & CONSTRUCT 251 NOS RESIDENTIAL QUARTERS (241 Nos. TYPE-II, 6 Nos. TYPE-III & 4 Nos. TYPE-IV), CTC-II, CRPF, COIMBATORE
NIL
39,55 Lakh
Project Budget
30 Jun 2016
Start Date
15 Jul 2018
Completion Date
RESIDENTIAL
Location
Project Team / Contact Us
| S.No. | Name(Mr/Mrs) | Designation | Office Address | Office Number | Mobile Number | Email ID |
|---|---|---|---|---|---|---|
| 1 | SITA RAM KINRA | CE | SZ-IV |
TECHNOLOGY
The proposed building is designed and constructed as cast-in-situ up to foundation and precast / pre-stressed in super structure involving columns, beams, hollow core slabs, ramp, staircases, external / internal walls and lift core walls and other precast elements as per design requirements.
1. The pollution levels can be controlled / minimized at site.
2. Minimum / optimum usage of water at site.
3. Since the elements are manufacture / cast under control condition, the quantity of concrete is better.
4. The campus is functional campus. In and around all the buildings are occupied and in use. In particular the DATA Center for SBI which is working adjoining to Car Parking is to be free from external dust.
5. There was no free space available to stack material and machinery for making green concrete at site.